DAQ Job Jar Last update: January 10, 1996 This list is totally random and arbitray. For additions and comments, send a mail to jurgen The letters in the first column represent the person which are working on the item (J: Jurgen, M: Mao, E: Erik R., PM: Prakash, PC: Peter, F: Frank) J/M 1. Measure speed of single stream with TDC Data M 3. Test 1881 J 6. Update H643 daq document J 16. Connect and test DYC+ with RMH PC 24. Temperature Interlock for Fastbus Power Supplies 1/10/96 M 26. Cable all FSCCs to fiber modules 27. Cable all gates etc for TDCs 28. Make T0/T1/T2 working 29. Produce dummy data in FSDAs and ADCs on trigger 30. Cable trigger and deadtime at TDCs, ADCs and FSDA 31. Cable trigger and deadtime at CROS 32. Install SCC in Pit J 33. Test Spill Timing J 34. Install/use dbs 35. Install/use damp J 36. Test duf, release it E 37. Install and connect Terminal Server in Pit M 38. Cable all gates etc for ADCs J 39. Write MC events into DPMs J 40. Integrate Filter program 41. Write Interspill monitoring program control task J 42. Install new VME Crate M 43. Order/install new CAMAC cable 2/9/96 44. Install and connect ESN 46. connect fans in watercooled rack to one switch J 47. Install and test SCC J 48. Connect SCC, FSCC, HV, to terminal server J/BJ49. cables for FSCC and SCC J 50. Count wait's from each stream JM 51. cable LEDs for BAFs 3/4/96 J 52. measure deadtime of each system M 53. Test algorithm for clearing full fscc